Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA
53.7%
OF COST SPENT
₹141.86 Cr spent
of ₹264.34 Cr sanctioned
₹122.48 Cr still to spend
on 9,258 ongoing works
Works ongoing
9,258
Open the list of these works →
Sanctioned
₹264.34 Cr
Pure scheme (wage + material)
Expenditure since inception
₹141.86 Cr
53.7% of sanction
Balance cost (unspent)
₹122.48 Cr
Wage₹76.05 Cr
Material₹46.42 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore