Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
23.8%
OF COST SPENT
₹1.48 Cr spent
of ₹6.22 Cr sanctioned
₹4.74 Cr still to spend
on 79 ongoing works
Works ongoing
79
Open the list of these works →
Sanctioned
₹6.22 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.48 Cr
23.8% of sanction
Balance cost (unspent)
₹4.74 Cr
Wage₹1.33 Cr
Material₹3.42 Cr
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore