Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
0.6%
OF COST SPENT
₹4.04 L spent
of ₹6.63 Cr sanctioned
₹6.59 Cr still to spend
on 35 ongoing works
Works ongoing
35
Open the list of these works →
Sanctioned
₹6.63 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.04 L
0.6% of sanction
Balance cost (unspent)
₹6.59 Cr
Wage₹3.33 Cr
Material₹3.26 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore