Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
12.8%
OF COST SPENT
₹5.86 L spent
of ₹45.63 L sanctioned
₹39.77 L still to spend
on 13 ongoing works
Works ongoing
13
Open the list of these works →
Sanctioned
₹45.63 L
Pure scheme (wage + material)
Expenditure since inception
₹5.86 L
12.8% of sanction
Balance cost (unspent)
₹39.77 L
Wage₹34.29 L
Material₹5.48 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Dindori — Samnapur −₹35.68 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh