Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Well
56.3%
OF COST SPENT
₹9.57 Cr spent
of ₹17.00 Cr sanctioned
₹7.43 Cr still to spend
on 508 ongoing works
Works ongoing
508
Open the list of these works →
Sanctioned
₹17.00 Cr
Pure scheme (wage + material)
Expenditure since inception
₹9.57 Cr
56.3% of sanction
Balance cost (unspent)
₹7.43 Cr
Wage₹2.15 Cr
Material₹5.29 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore