Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Percolation Tank
6.3%
OF COST SPENT
₹1.04 L spent
of ₹16.51 L sanctioned
₹15.46 L still to spend
on 2 ongoing works
Works ongoing
2
Open the list of these works →
Sanctioned
₹16.51 L
Pure scheme (wage + material)
Expenditure since inception
₹1.04 L
6.3% of sanction
Balance cost (unspent)
₹15.46 L
Wage₹10.02 L
Material₹5.44 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Lakh