Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of GP Bhawan
69.1%
OF COST SPENT
₹56.96 L spent
of ₹82.43 L sanctioned
₹25.47 L still to spend
on 12 ongoing works
Works ongoing
12
Open the list of these works →
Sanctioned
₹82.43 L
Pure scheme (wage + material)
Expenditure since inception
₹56.96 L
69.1% of sanction
Balance cost (unspent)
₹25.47 L
Wage₹4.52 L
Material₹20.95 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh