Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of NADEP/Vermi Compost Pit
89.8%
OF COST SPENT
₹2.54 L spent
of ₹2.82 L sanctioned
₹28,672 still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹2.82 L
Pure scheme (wage + material)
Expenditure since inception
₹2.54 L
89.8% of sanction
Balance cost (unspent)
₹28,672
Wage₹4,184
Material₹24,488
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh