Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Tank
43.8%
OF COST SPENT
₹2.60 Cr spent
of ₹5.93 Cr sanctioned
₹3.34 Cr still to spend
on 47 ongoing works
Works ongoing
47
Open the list of these works →
Sanctioned
₹5.93 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.60 Cr
43.8% of sanction
Balance cost (unspent)
₹3.34 Cr
Wage₹2.24 Cr
Material₹1.09 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost