Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
73.7%
OF COST SPENT
₹14.74 Cr spent
of ₹20.01 Cr sanctioned
₹5.27 Cr still to spend
on 177 ongoing works
Works ongoing
177
Open the list of these works →
Sanctioned
₹20.01 Cr
Pure scheme (wage + material)
Expenditure since inception
₹14.74 Cr
73.7% of sanction
Balance cost (unspent)
₹5.27 Cr
Wage₹3.04 Cr
Material₹2.23 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore