Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
43.7%
OF COST SPENT
₹1.01 L spent
of ₹2.30 L sanctioned
₹1.29 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹2.30 L
Pure scheme (wage + material)
Expenditure since inception
₹1.01 L
43.7% of sanction
Balance cost (unspent)
₹1.29 L
Wage₹97,630
Material₹31,810
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh