Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Cement Concrete Roads
63.1%
OF COST SPENT
₹176.05 Cr spent
of ₹278.90 Cr sanctioned
₹102.86 Cr still to spend
on 10,625 ongoing works
Works ongoing
10,625
Open the list of these works →
Sanctioned
₹278.90 Cr
Pure scheme (wage + material)
Expenditure since inception
₹176.05 Cr
63.1% of sanction
Balance cost (unspent)
₹102.86 Cr
Wage₹58.28 Cr
Material₹44.58 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type