Ongoing works in MGNREGA

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Percolation Tank
5.1%
OF COST SPENT
₹2.01 L spent
of ₹39.58 L sanctioned
₹37.57 L still to spend
on 10 ongoing works
Works ongoing
10
Open the list of these works →
Sanctioned
₹39.58 L
Pure scheme (wage + material)
Expenditure since inception
₹2.01 L
5.1% of sanction
Balance cost (unspent)
₹37.57 L
Wage₹27.54 L
Material₹10.04 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹10.48 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh