Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGBoulder Check/Gully Plug
1.7%
OF COST SPENT
₹34.82 L spent
of ₹20.13 Cr sanctioned
₹19.78 Cr still to spend
on 643 ongoing works
Works ongoing
643
Open the list of these works →
Sanctioned
₹20.13 Cr
Pure scheme (wage + material)
Expenditure since inception
₹34.82 L
1.7% of sanction
Balance cost (unspent)
₹19.78 Cr
Wage₹12.69 Cr
Material₹7.08 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Crore