Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
0.1%
OF COST SPENT
₹97,200 spent
of ₹15.14 Cr sanctioned
₹15.13 Cr still to spend
on 57 ongoing works
Works ongoing
57
Open the list of these works →
Sanctioned
₹15.14 Cr
Pure scheme (wage + material)
Expenditure since inception
₹97,200
0.1% of sanction
Balance cost (unspent)
₹15.13 Cr
Wage₹7.84 Cr
Material₹7.29 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh