Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Bund
3.6%
OF COST SPENT
₹5.00 L spent
of ₹1.40 Cr sanctioned
₹1.35 Cr still to spend
on 29 ongoing works
Works ongoing
29
Open the list of these works →
Sanctioned
₹1.40 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.00 L
3.6% of sanction
Balance cost (unspent)
₹1.35 Cr
Wage₹85.29 L
Material₹49.33 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh