Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
11.6%
OF COST SPENT
₹9.15 L spent
of ₹79.09 L sanctioned
₹69.94 L still to spend
on 14 ongoing works
Works ongoing
14
Open the list of these works →
Sanctioned
₹79.09 L
Pure scheme (wage + material)
Expenditure since inception
₹9.15 L
11.6% of sanction
Balance cost (unspent)
₹69.94 L
Wage₹40.55 L
Material₹29.39 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh