Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Cement Concrete Roads
13.4%
OF COST SPENT
₹4.80 L spent
of ₹35.76 L sanctioned
₹30.96 L still to spend
on 12 ongoing works
Works ongoing
12
Open the list of these works →
Sanctioned
₹35.76 L
Pure scheme (wage + material)
Expenditure since inception
₹4.80 L
13.4% of sanction
Balance cost (unspent)
₹30.96 L
Wage₹8.52 L
Material₹22.44 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost