Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of Gabion
58.3%
OF COST SPENT
₹19.15 L spent
of ₹32.83 L sanctioned
₹13.68 L still to spend
on 8 ongoing works
Works ongoing
8
Open the list of these works →
Sanctioned
₹32.83 L
Pure scheme (wage + material)
Expenditure since inception
₹19.15 L
58.3% of sanction
Balance cost (unspent)
₹13.68 L
Wage₹4.30 L
Material₹9.38 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh