Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGWorks for Flood Control and Protection
0.1%
OF COST SPENT
₹8.89 L spent
of ₹108.18 Cr sanctioned
₹108.09 Cr still to spend
on 1,691 ongoing works
Works ongoing
1,691
Open the list of these works →
Sanctioned
₹108.18 Cr
Pure scheme (wage + material)
Expenditure since inception
₹8.89 L
0.1% of sanction
Balance cost (unspent)
₹108.09 Cr
Wage₹65.01 Cr
Material₹43.08 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore