Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
39.1%
OF COST SPENT
₹74.03 Cr spent
of ₹189.57 Cr sanctioned
₹115.54 Cr still to spend
on 9,100 ongoing works
Works ongoing
9,100
Open the list of these works →
Sanctioned
₹189.57 Cr
Pure scheme (wage + material)
Expenditure since inception
₹74.03 Cr
39.1% of sanction
Balance cost (unspent)
₹115.54 Cr
Wage₹59.50 Cr
Material₹56.04 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore