Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
23.1%
OF COST SPENT
₹20.82 L spent
of ₹90.24 L sanctioned
₹69.43 L still to spend
on 16 ongoing works
Works ongoing
16
Open the list of these works →
Sanctioned
₹90.24 L
Pure scheme (wage + material)
Expenditure since inception
₹20.82 L
23.1% of sanction
Balance cost (unspent)
₹69.43 L
Wage₹37.73 L
Material₹31.70 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh