Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Cement Concrete Roads
45.7%
OF COST SPENT
₹59.25 L spent
of ₹1.30 Cr sanctioned
₹70.53 L still to spend
on 114 ongoing works
Works ongoing
114
Open the list of these works →
Sanctioned
₹1.30 Cr
Pure scheme (wage + material)
Expenditure since inception
₹59.25 L
45.7% of sanction
Balance cost (unspent)
₹70.53 L
Wage₹43.55 L
Material₹26.98 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore