Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Water Drain/Diversion Channel/Drainage/Field Channel
0.4%
OF COST SPENT
₹12.35 L spent
of ₹32.56 Cr sanctioned
₹32.43 Cr still to spend
on 588 ongoing works
Works ongoing
588
Open the list of these works →
Sanctioned
₹32.56 Cr
Pure scheme (wage + material)
Expenditure since inception
₹12.35 L
0.4% of sanction
Balance cost (unspent)
₹32.43 Cr
Wage₹17.71 Cr
Material₹14.72 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Crore