Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
42.9%
OF COST SPENT
₹51.54 Cr spent
of ₹120.21 Cr sanctioned
₹68.67 Cr still to spend
on 12,467 ongoing works
Works ongoing
12,467
Open the list of these works →
Sanctioned
₹120.21 Cr
Pure scheme (wage + material)
Expenditure since inception
₹51.54 Cr
42.9% of sanction
Balance cost (unspent)
₹68.67 Cr
Wage₹38.36 Cr
Material₹30.31 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore