Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
0%
OF COST SPENT
₹29,724 spent
of ₹9.77 Cr sanctioned
₹9.77 Cr still to spend
on 35 ongoing works
Works ongoing
35
Open the list of these works →
Sanctioned
₹9.77 Cr
Pure scheme (wage + material)
Expenditure since inception
₹29,724
0% of sanction
Balance cost (unspent)
₹9.77 Cr
Wage₹5.01 Cr
Material₹4.76 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore