Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGFarm Pond
3.3%
OF COST SPENT
₹10.74 L spent
of ₹3.27 Cr sanctioned
₹3.17 Cr still to spend
on 127 ongoing works
Works ongoing
127
Open the list of these works →
Sanctioned
₹3.27 Cr
Pure scheme (wage + material)
Expenditure since inception
₹10.74 L
3.3% of sanction
Balance cost (unspent)
₹3.17 Cr
Wage₹2.40 Cr
Material₹76.41 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Bhind ₹43,128
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore