Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
2.6%
OF COST SPENT
₹3.59 L spent
of ₹1.38 Cr sanctioned
₹1.34 Cr still to spend
on 7 ongoing works
Works ongoing
7
Open the list of these works →
Sanctioned
₹1.38 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.59 L
2.6% of sanction
Balance cost (unspent)
₹1.34 Cr
Wage₹44.55 L
Material₹89.76 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh