Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Tank
0.4%
OF COST SPENT
₹5.65 L spent
of ₹13.10 Cr sanctioned
₹13.04 Cr still to spend
on 162 ongoing works
Works ongoing
162
Open the list of these works →
Sanctioned
₹13.10 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.65 L
0.4% of sanction
Balance cost (unspent)
₹13.04 Cr
Wage₹6.33 Cr
Material₹6.71 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore