Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Tank
47.5%
OF COST SPENT
₹2.02 Cr spent
of ₹4.26 Cr sanctioned
₹2.24 Cr still to spend
on 30 ongoing works
Works ongoing
30
Open the list of these works →
Sanctioned
₹4.26 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.02 Cr
47.5% of sanction
Balance cost (unspent)
₹2.24 Cr
Wage₹87.66 L
Material₹1.36 Cr
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore