Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Water Drain/Diversion Channel/Drainage/Field Channel
12.5%
OF COST SPENT
₹25.96 L spent
of ₹2.08 Cr sanctioned
₹1.82 Cr still to spend
on 63 ongoing works
Works ongoing
63
Open the list of these works →
Sanctioned
₹2.08 Cr
Pure scheme (wage + material)
Expenditure since inception
₹25.96 L
12.5% of sanction
Balance cost (unspent)
₹1.82 Cr
Wage₹1.24 Cr
Material₹58.35 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹10.48 Cr