Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
57.3%
OF COST SPENT
₹15.80 L spent
of ₹27.57 L sanctioned
₹11.77 L still to spend
on 2 ongoing works
Works ongoing
2
Open the list of these works →
Sanctioned
₹27.57 L
Pure scheme (wage + material)
Expenditure since inception
₹15.80 L
57.3% of sanction
Balance cost (unspent)
₹11.77 L
Wage₹3.66 L
Material₹8.10 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP