Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Tank
43.5%
OF COST SPENT
₹7.86 Cr spent
of ₹18.06 Cr sanctioned
₹10.20 Cr still to spend
on 161 ongoing works
Works ongoing
161
Open the list of these works →
Sanctioned
₹18.06 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.86 Cr
43.5% of sanction
Balance cost (unspent)
₹10.20 Cr
Wage₹6.43 Cr
Material₹3.77 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore