MGNREGA + VBGRAMGConstr of Compound wall
23.8%
OF COST SPENT
₹65,406 spent
of ₹2.74 L sanctioned
₹2.09 L still to spend
on 2 ongoing works
Works ongoing
2
Open the list of these works →
Sanctioned
₹2.74 L
Pure scheme (wage + material)
Expenditure since inception
₹65,406
23.8% of sanction
Balance cost (unspent)
₹2.09 L
Wage₹1.50 L
Material₹59,100
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr