Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Road and Culvert
32.7%
OF COST SPENT
₹6.51 L spent
of ₹19.88 L sanctioned
₹13.38 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹19.88 L
Pure scheme (wage + material)
Expenditure since inception
₹6.51 L
32.7% of sanction
Balance cost (unspent)
₹13.38 L
Wage₹8.05 L
Material₹5.32 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown