Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
18.9%
OF COST SPENT
₹15.50 L spent
of ₹82.06 L sanctioned
₹66.56 L still to spend
on 7 ongoing works
Works ongoing
7
Open the list of these works →
Sanctioned
₹82.06 L
Pure scheme (wage + material)
Expenditure since inception
₹15.50 L
18.9% of sanction
Balance cost (unspent)
₹66.56 L
Wage₹12.09 L
Material₹54.47 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh