Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
80.4%
OF COST SPENT
₹7.29 Cr spent
of ₹9.07 Cr sanctioned
₹1.78 Cr still to spend
on 35 ongoing works
Works ongoing
35
Open the list of these works →
Sanctioned
₹9.07 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.29 Cr
80.4% of sanction
Balance cost (unspent)
₹1.78 Cr
Wage₹51.93 L
Material₹1.26 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown