Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
0.3%
OF COST SPENT
₹3.53 L spent
of ₹11.79 Cr sanctioned
₹11.75 Cr still to spend
on 189 ongoing works
Works ongoing
189
Open the list of these works →
Sanctioned
₹11.79 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.53 L
0.3% of sanction
Balance cost (unspent)
₹11.75 Cr
Wage₹5.20 Cr
Material₹6.55 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Dindori — Samnapur −₹35.68 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore