Ongoing works in VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
3.4%
OF COST SPENT
₹5.18 Cr spent
of ₹152.01 Cr sanctioned
₹146.83 Cr still to spend
on 13,168 ongoing works
Works ongoing
13,168
Open the list of these works →
Sanctioned
₹152.01 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.18 Cr
3.4% of sanction
Balance cost (unspent)
₹146.83 Cr
Wage₹84.95 Cr
Material₹61.88 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore