Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
0.5%
OF COST SPENT
₹47.68 L spent
of ₹103.93 Cr sanctioned
₹103.46 Cr still to spend
on 447 ongoing works
Works ongoing
447
Open the list of these works →
Sanctioned
₹103.93 Cr
Pure scheme (wage + material)
Expenditure since inception
₹47.68 L
0.5% of sanction
Balance cost (unspent)
₹103.46 Cr
Wage₹29.60 Cr
Material₹73.85 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
NARMADAPURAM — HOSHANGABAD ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore