MGNREGAConstruction of Check Dam/Stop Dam
70.7%
OF COST SPENT
₹10.50 Cr spent
of ₹14.86 Cr sanctioned
₹4.36 Cr still to spend
on 211 ongoing works
Works ongoing
211
Open the list of these works →
Sanctioned
₹14.86 Cr
Pure scheme (wage + material)
Expenditure since inception
₹10.50 Cr
70.7% of sanction
Balance cost (unspent)
₹4.36 Cr
Wage₹1.05 Cr
Material₹3.31 Cr