Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Fish Drying Infrastructure
2.4%
OF COST SPENT
₹4.46 L spent
of ₹1.88 Cr sanctioned
₹1.84 Cr still to spend
on 69 ongoing works
Works ongoing
69
Open the list of these works →
Sanctioned
₹1.88 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.46 L
2.4% of sanction
Balance cost (unspent)
₹1.84 Cr
Wage₹1.12 Cr
Material₹71.67 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Lakh