Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Aganwadi
67.2%
OF COST SPENT
₹2.45 Cr spent
of ₹3.65 Cr sanctioned
₹1.20 Cr still to spend
on 63 ongoing works
Works ongoing
63
Open the list of these works →
Sanctioned
₹3.65 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.45 Cr
67.2% of sanction
Balance cost (unspent)
₹1.20 Cr
Wage₹35.47 L
Material₹84.27 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Ater ₹15.77 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore