Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
26.7%
OF COST SPENT
₹3.81 Cr spent
of ₹14.27 Cr sanctioned
₹10.46 Cr still to spend
on 138 ongoing works
Works ongoing
138
Open the list of these works →
Sanctioned
₹14.27 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.81 Cr
26.7% of sanction
Balance cost (unspent)
₹10.46 Cr
Wage₹5.39 Cr
Material₹5.06 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Ater ₹15.77 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore