Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
1.6%
OF COST SPENT
₹4.14 L spent
of ₹2.59 Cr sanctioned
₹2.55 Cr still to spend
on 28 ongoing works
Works ongoing
28
Open the list of these works →
Sanctioned
₹2.59 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.14 L
1.6% of sanction
Balance cost (unspent)
₹2.55 Cr
Wage₹1.13 Cr
Material₹1.42 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore