Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
48.6%
OF COST SPENT
₹1.36 Cr spent
of ₹2.80 Cr sanctioned
₹1.44 Cr still to spend
on 47 ongoing works
Works ongoing
47
Open the list of these works →
Sanctioned
₹2.80 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.36 Cr
48.6% of sanction
Balance cost (unspent)
₹1.44 Cr
Wage₹87.43 L
Material₹56.24 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore