Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
53.9%
OF COST SPENT
₹8.22 Cr spent
of ₹15.26 Cr sanctioned
₹7.04 Cr still to spend
on 481 ongoing works
Works ongoing
481
Open the list of these works →
Sanctioned
₹15.26 Cr
Pure scheme (wage + material)
Expenditure since inception
₹8.22 Cr
53.9% of sanction
Balance cost (unspent)
₹7.04 Cr
Wage₹1.67 Cr
Material₹5.37 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore