Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
40.7%
OF COST SPENT
₹1.62 Cr spent
of ₹3.98 Cr sanctioned
₹2.36 Cr still to spend
on 94 ongoing works
Works ongoing
94
Open the list of these works →
Sanctioned
₹3.98 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.62 Cr
40.7% of sanction
Balance cost (unspent)
₹2.36 Cr
Wage₹1.11 Cr
Material₹1.25 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Alirajpur — Jobat ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore