Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
74.1%
OF COST SPENT
₹9.44 Cr spent
of ₹12.73 Cr sanctioned
₹3.29 Cr still to spend
on 56 ongoing works
Works ongoing
56
Open the list of these works →
Sanctioned
₹12.73 Cr
Pure scheme (wage + material)
Expenditure since inception
₹9.44 Cr
74.1% of sanction
Balance cost (unspent)
₹3.29 Cr
Wage₹79.94 L
Material₹2.49 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore