Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
3%
OF COST SPENT
₹9.40 L spent
of ₹3.12 Cr sanctioned
₹3.03 Cr still to spend
on 51 ongoing works
Works ongoing
51
Open the list of these works →
Sanctioned
₹3.12 Cr
Pure scheme (wage + material)
Expenditure since inception
₹9.40 L
3% of sanction
Balance cost (unspent)
₹3.03 Cr
Wage₹1.32 Cr
Material₹1.71 Cr
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh